Italics means action items not done last week. (None this week! Yet.)
Strike through means items that will not be checked this week, but will be checked in the future.
Take team member attendance in the team attendance tracker sheet in blog
Check availability for the next meeting (10/15): Missing Evan and Amanda; Abhishek, Patrick and Samuel need to update their attendance
Agenda (7:00pm):
Logistics
-Check action items completion
-FLL scrimmage sponsoring (Evan)
-PTC Windchill post status (Justin)
-Engineer connection update (Samuel)
-Mentoring teams update (Samuel)
-Team blog notification mechanism (Brandon) (long term)
-FTC SDK demo (Brandon)
-Logo status (Evan)
Non-essential Technical item status updates
-MathCAD: (Samuel and Abhishek to try physics homework in the program)
-Vuforia SDK: (Samuel to try the program and report status)
-ESD: (Evan to continue research and report findings)
Engineering notebook (Jerry)
-Review entries for last meeting including Executive Summary (all content should be in by 7pm)
-Overall: Samuel
-Hardware section (coordinate to avoid overwritting) : Patrick
-Software section: Brandon
-CAD section: Jerry
Game rule updates (Abhishek) (updates should make into Engineering Notebook)
Robot Design discussion (discussion points should make into Engineering Notebook)
Autonomous strategy (Patrick/Brandon):
Chassis design (Patrick):
Beacon mechanism (Patrick):
Harvester mechanism (Amanda):
Shooter mechanism (Abhishek):
Cap ball mechanism (Evan):
Prototype Robot:
Misc
Robot
-Program Autonomous (Brandon and Patrick)
-Build actual attachments (Hardware team)
-Communicate about how to put robot together (Patrick)
================================================================================
Agenda (10:30pm):
Check action item completion for team members who come in late
Engineering notebook Executive Summary Draft Review
Assign post meeting action items
================================================================================
In meeting Action items (9:00pm)
Action items: