Italics means action items not done last week.
Strike through means items that will not be checked this week, but will be checked in the future.
Take team member attendance in the team attendance tracker sheet in blogĀ (Abhishek)
Check availability for the next meeting (10/29): Jerry will be there, everyone else needs to update
Agenda (8:00pm):
Logistics
-Check action items completion
-FLL scrimmage sponsoring (Evan) and Role Assignment (assigned roles)
-Riddle STEAM Fair preparation (Fix TRR robot, program the vuforia bot, CAD model simulation demo, puzzle with 3D mouse, trophies with super regional video)
-PTC Windchill post status (Justin) and PTC grant obligation (coach will email PTC)
-Twitter account review (CAD team to get mp4 file to Amanda for twittering in future)
-Banner design review
-Pit area design (navy tent, rope of LED lights, Button, poster, gold ballon, Candy machine)
-League updates and Arkansas qualifier
-Engineer connection update (Samuel)
-Mentoring teams update (Samuel)
-Team blog notification mechanism (Brandon) (long term)
Non-essential Technical item status updates
-MathCAD: (Samuel and Abhishek to try physics homework in the program)
-Vuforia SDK: (Samuel to try the program and report status)
-ESD: (Evan to continue research and report findings)
Engineering notebook (Samuel)
-Review entries for last meeting including Executive Summary (all content should be in by 7pm)
-Overall: Samuel
-Hardware section (coordinate to avoid overwriting) : Abhishek
-Software section: Brandon
-CAD section: Justin
Game rule updates (Abhishek) (updates should make into Engineering Notebook)
Robot Design discussion (discussion points should make into Engineering Notebook)
Autonomous strategy (Patrick/Brandon):
Chassis design (Patrick):
Beacon mechanism (Patrick):
Harvester mechanism (Amanda):
Shooter mechanism (Abhishek):
Ball transporter mechanism (Abhishek):
Cap ball mechanism (Evan):
Testing Chassis (Evan)
Misc
Discuss if whether we will go to Arkansas Tournament (Abhishek)
Do inventory of controllers, etc. (Patrick)
Begin CAD model of chassis/attachments, post progress in notebook (Justin)
================================================================================
Agenda (10:30pm):
Check action item completion for team members who come in late
Engineering notebook Executive Summary Draft Review
Assign post meeting action items
================================================================================
In meeting Action items (9:00pm)
Action items: