Team members:

Setup and Cleanup for next meeting: (names mean penalty duty)

Engineering Notebook (due Thursday night midnight)

  • Overall:
  • Hardware:
  • Software:
  • CAD:

Agenda:

  • 11/19 FLL Scrimmage Role assignments
  • Texas Library Association Conference and the TLA Innovation Lab 4/3-4/6, 2018
  • Mentoring availability check
  • Team shirt size collection
  • Action item check (including Engineering Notebook)
  • Rule update check (Jerry)
  • Review scouting sheet and google form
  • Review Inspiration Book entries
  • Go over presentation- qualifier on 12/16
  • Strategy discussion/show prototypes/test prototypes
  • Review Engineering Notebook / Inspiration Notebook (getting ready for qualifiers)
  • Team role assignments including (pit crew check list and robot inspection)
  • Tune teleop
  • Tune autonomous
  • Sign off last Engineering Notebook entry with Managers and Coach before leaving the meeting

Action Items: (Blue means completed, Black means ongoing and Red means uncompleted)

  • General
    • Everyone: Based on the discussion of the presentation plan, fill in the pictures for your portion in the prezi so we can view all together in the next meeting (even if you don’t have a finalized picture, put some placeholders there so we can feel the layout and pace)
      • https://prezi.com/view/W9XIfEd7ClN72kWcrv1S/
    • Jerry: obtain agreement on the team jacket design and let coach know to order
    • Samuel: prepare the first draft of team brochure for review next team meeting
    • Samuel: finalize inspiration book for presentation
      • Brandon: will write upcoming FLL scrimmage
      • Evan: will write upcoming ACP demo
    • Samuel: document the trouble shooting resource for wireless connection per the email
    • Everyone: review Amanda’s team scouting interview sheet to provide feedback
      • https://docs.google.com/document/d/1Y0SUnsSro3GiqvRmHU_4HbFuKbZcGVdQbEx8t5w82w8/edit
    • Jerry: check rule updates
    • Everyone: ACP preparation (all arriving 11:20 am at coach’s home to pack/load and leave at 11:30 am)
      • Evan/Abhishek: make sure world championship robot is working and get familiar with it to explain
      • Evan: prepare the video files on usb stick so we can play them besides the field
      • Jerry/Samuel: get RVW app on to ipad and get familiar with it to explain
      • Justin: get CAD model of world championship robot on to your laptop and get familiar with it to explain
    • Everyone: FLL scrimmage preparation(all arriving 1:10 pm at coach’s home to pack/load and leave at 1:20 pm)
      • Samuel: create draft schedule to make sure scheduling software is working
      • Samuel: recruit 1-2 volunteers for queuing
      • Justin/Abhishek: field loader and transporter
      • Amanda: get ready to be timer
      • Abhishek/Evan/Brandon: get ready to mentor 12810 teams during scrimmage
      • Samuel: create draft schedule to make sure scheduling software is working
      • Jerry: prepare for food concessions (signs and changes etc. I will purchase from Costco based on agreement)
      • Amanda: design and print 4 certificates to be presented to the FLL teams at the scrimmage to appreciate their help
        • two certificates to the teams who provide the mission models for competition (FLL team 31452 Terminator and FLL team 31485 Lego Maniacs)
        • two certificates to the teams who provide one team member to serve as assistant referees (FLL team 31452 Terminator and FLL team 35288 Rangers)
  • Software
    • Brandon/Jerry: update Engineering notebook for details on software design/coding/debugging:
    • Brandon: complete jewball scoring code and verify crypto picture recognition
    • Brandon: update team repository to FTC SDK 3.5 (please do it for 12810 too)
    • Jerry: document the two different programs testing the two mechanisms and the USB cable issue (what error with USB cable)
    • Jerry: start working on pitcrew program
    • Jerry: document the Java class diagram
  • CAD
    • Justin: continue CAD modeling and document in the engineering notebook
    • Justin: review 12810 3D print models and provide guidance
  • Hardware
    • Evan/Abhishek: improving mechanism (now we have programs for both mechanism) and we will need to make decision in the next meeting
    • Amanda: document your thoughts on relic design (there is no documentation on it at all since this task was assigned a few weeks ago)

8565 TechnicBots Meeting #9 – 11/11/2017

Leave a Reply