Team members:

All except Evan, Amanda and Brandon

Agenda:

  • Action items check
  • GIGAWOT camp activities proposal
  • Boys and Girls Club Demo preparation
  • RCCG Church Demo preparation
  • Youth Robotics Fair preparation
    • activity preparation document review
  • PTC CAD modeling QA
  • Youth robotics fair activity leads individual discussions
  • Ongoing work check:
    • Engineering Notebook Cover Design (monthly)
    • Prezi presentation Design (monthly)
    • AutoDesk capability investigation (monthly)
    • Outreach activity leads status check (monthly)
    • Chassis study project video (monthly)
    • Chassis Study Work Engineering Notebook entry feedback (weekly)
    • Chassis Study Work issue discussions (weekly)
Action Items: (Blue means completed, Black means ongoing and Red means uncompleted)

General

  • Summer Ongoing work:
    • Audrey: Engineering Notebook Cover design
    • Amanda: prezi presentation as visual aid for in pit judging interview
    • Justin: study the AutoDesk capability in rendering the simulation and automation with PTC model
    • Max: create the video for community wide chassis study project

Outreach

  • GIGAWOT curriculum design
    • Melody/Audrey/Amanda: think about activity attractive to the girls which may involve IoT and mobile app (MIT AppInventor)
    • Samuel: collect detailed information on a possible Augmented Reality demo and development session
  • Boys and Girls Club STEM Project Open House event preparation (due Friday midnight)
    • Brandon: create google slide document with the template for the presentation, add the link to the outreach preparation document
    • Brandon: make sure all team member and parent’s availability are confirmed and transportation for each items on the pack list is confirmed (especially the large items)
    • Everyone: create your slides (2-3) of your topics as listed in the outreach preparation document (agreed from last meeting) and in the same order as listed in the document
    • Evan: complete the talking points on relic arm mechanism (in outreach preparation document, I have done the other parts in the doc already)
    • Evan/Austin: make sure the robots are in ready state (relic arm needs to be repaired)
  • RCCG Church Demo event preparation
    • Jerry: create the event on outreach tab of team google sheet
    • Jerry: create the preparation document for the event and put the link into the outreach tab (including the items that we talked about last meeting)
  • Youth Robotics Fair preparation
    • Actions needed for the preparation
      • Everyone: 
        • make your preparation document sharable so others can view and minimally editable by me
        • update your preparation document based on latest template doc (where I added session length and participants per session)
      • Evan/Abhishek: FTC Robot scrimmage and driving experiences
        • follow the template preparation doc to include everything needed
        • Scrimmage portion to be added in
      • Abhishek/Amanda: Myoelectric Prosthetic Arm Experience
        • Packlist needs to be split into multiple rows with each row only having one item (add electrode to be purchased too)
        • Technical points need to be extensively expanded so other team member could explain
        • Add diagrams for the explanation (which we will make into laminated sheets)
        • Add the calibration steps for the arm
        • Add the overall steps for a session
      • Justin/Austin: Robo Sumo wrestling
        • follow the template preparation doc to include everything needed
        • 4/14 meeting: Joint discussions on the update based on information from the other two events
      • Austin/Justin: Line follower contest
        • follow the template preparation doc to include everything needed
        • 4/14 meeting: Joint discussions on the update based on information from the other two events
      • Samuel/Anthony: Roomba virtual challenge
        • Add in visual aids for technical points explanation (flowchart, python sample code etc)
        • 4/14 meeting: setup on Anthony’s laptop; get Anthony familiar with the entire activity flow
      • Jerry/Max: 3D mouse cue challenge
        • Locate the 3D mouse otherwise the activity needs to be replaced
        • Any reference link for understanding more of 3D mouse and puzzle
        • 4/28 meeting: setup on Max’s laptop; get Max familiar with the entire activity flow
      • Brandon/Ray: ipad RVW programming challenge
        • No permission to view the doc to provide the feedback
        • 4/14 meeting: setup on Ray’s ipad; get Ray familiar with the entire activity flow
      • Melody: Rubber Band Race Car
        • 4/14 meeting: Coach review and approve
      • Derek: Spartan robot
        • follow the template preparation doc to include everything needed
        • Add in visual aids for technical points explanation (IR sensor etc)
        • 4/14 meeting: install Arduino IDE so you can program the Robot too and can show/explain the code to the participants if asked; take home the Robot to practice
      • Max/Anthony: EV3 maze
        • Max to follow the template preparation doc to include everything needed
        • Anthony to create an Android app using MIT app inventor to drive the robot with tilting of the device (http://appinventor.mit.edu/explore/ai2/lego-%C2%AE-ev3-tilt-drive.html)
        • Ray: build a simple EV3 chassis for next experiment with MIT app inventor
      • Audrey: Scratch app with kinetics
        • 4/14 meeting: experience the demo so you can start writing out the preparation doc
    • Template preparation doc:

https://docs.google.com/document/d/1zvNBxvuDauW41iuFWuTe3m9F876qcTl50GHMpKH1byY/edit?usp=sharing

Technical

  • Melody/Evan: install PTC 4.0 on your computer and download kits of parts models for the kits assigned to you and get familiar with the parts
  • Everyone(Abhishek): log your entries to the April engineering notebook; for this week, you will log anything your learnt and resolved in PTC while working on your chassis model and a picture of the latest chassis model in the engineering notebook
  • Brandon: initial draft of the executive summary of the chassis study project in April engineering notebook
  • Max: Finish initial draft of your plan on shooting the video for the chassis study project (Evan and I will review with you during next meeting for feedback)

8565 Pre-season Team Meeting #2 – 4/7/2018

Leave a Reply