Team members:

All except Brandon, Amanda, Melody

Agenda:

  • Action items check
  • GIGAWOT curriculum design (Samuel/Anthony)
  • 6/2 CIE MathFun Preparation
  • Youth Robotics Fair preparation
    • Marketing status check (we need coordination and plan earlier and marketing coordinator with parent mentor)
    • Volunteer training summary (we need team members to coordinate the volunteers with parent mentor)
    • Survey response review and finalize the hand out page for bulk copying
    • Site Layout
    • Sign content review
    • Prizes (every participant should get a token to exchange for candies and pencils at award center)
    • Final Review of all activities
      • Everyone iterates what the points you are trying to teach the kids
      • Everyone is responsible to pack anything related to their activities (details tracked in your own document) and printout anything they need
      • Everyone is responsible to use the signup sheet template for creating their signup sheet
      • Evan/Abhishek:
        • Update Volunteer info in preparation doc
        • Update scoring table
        • Insert 12810 robot control keys into referee guide
        • Email the latest referee guide doc to all volunteers
        • setup the TV and timer monitor and audio system to test out
      • Abhishek/Amanda:
        • Demonstrate the arm to coach to make sure it is working
      • Justin/Austin:
        • prepare the materials for the competition
        • print signup list from website
        • send reminder email to all participants about tomorrow’s event
        • Review the final rules, print out for lamination
      • Anthony/Max:
        • tilt position illustration should be all relative to the same starting position
        • all on the same page and print out for lamination
      • Derek:
        • Add screen capture of the code into preparation doc and print out for lamination
      • Audrey:
        • Prepare the printout for the participants if they want to use it at home
        • Go through the entire scenario step by step
        • Fine tune the illustration diagrams for printout and laminate
  • PTC CAD modeling QA
  • Team laptop setup
    • Brandon to setup Android Studio on Team laptop
  • Ongoing work check:
    • Engineering Notebook Cover Design (monthly)
    • Prezi presentation Design (monthly)
    • AutoDesk capability investigation (monthly)
    • Outreach activity leads status check (monthly)
    • Chassis study project video (monthly) — Evan/Max to review plan then explain to Coach
    • Chassis Study Work Engineering Notebook entry feedback (weekly)
    • Chassis Study Work issue discussions (weekly)
Action Items: (Blue means completed, Black means ongoing and Red means uncompleted)

General

  • Summer Ongoing work:
    • Audrey: Engineering Notebook Cover design
    • Amanda: prezi presentation as visual aid for in pit judging interview
    • Justin: study the AutoDesk capability in rendering the simulation and automation with PTC model
    • Max: create the video for community wide chassis study project

Outreach

  • General:
    • Everyone: indicate your availability for 6/2/2018 CIE MathFun demo event
    • Everyone: update with your final preparation hours for YRF
    • Everyone: indicate your availability for all summer meeting availabilities (when you are not sure yet, put maybe for now so at least I know who definitely will be there and who definitely will not be there)
    • Audrey: complete the cover page design, buy 2″ and 1.5″ white binders to finish the cover
  • GIGAWOT prepartion
    • Samuel: create Smart Home Robot activity outline

Technical

  • Everyone: finalize your chassis CAD model, record your simulation of model in a video file (a few seconds file and send to technicbots.team@gmail.com)  and update engineering notebook Due midnight Friday nigh
  • Everyone: send BOM list to coach for purchase if you are ready to build
  • Abhishek/Evan: bring the spare Tetrix parts listed by Audrey/Derek BOM list
  • Justin/Jerry: prepare the GrabCAD setup to allow team members to drop the CAD model file to share (also for participating FTC teams)

8565 Pre-season Team meeting #8 – 05/19/2018

Leave a Reply