Team members:
All except Brandon, Melody and Max
Agenda:
- Action items check
- GIGAWOT camp activities proposal
- Boys and Girls Club Demo summary
- RCCG Church Demo preparation
- Youth Robotics Fair preparation
- activity preparation document review
- PTC CAD modeling QA
- Youth robotics fair activity review and approval with Coach
- Evan/Abhishek
- Abhishek/Amanda
- Team laptop setup
- Justin to finish installation of PTC
- Ongoing work check:
- Engineering Notebook Cover Design (monthly)
- Prezi presentation Design (monthly)
- AutoDesk capability investigation (monthly)
- Outreach activity leads status check (monthly)
- Chassis study project video (monthly)
- Chassis Study Work Engineering Notebook entry feedback (weekly)
- Chassis Study Work issue discussions (weekly)
Action Items: (Blue means completed, Black means ongoing and Red means uncompleted)
General
- Summer Ongoing work:
- Audrey: Engineering Notebook Cover design
- Amanda: prezi presentation as visual aid for in pit judging interview
- Justin: study the AutoDesk capability in rendering the simulation and automation with PTC model
- Max: create the video for community wide chassis study project
Outreach
- GIGAWOT curriculum design
- Everyone: indicate your availability for each day of the camp in the outreach tab of team google sheet
- Boys and Girls club open house demo preparation
- Everyone: indicate your availability for 5/4 in the outreach tab of team google sheet Due by 4/22 Sunday midnight
- Improve your slides based on feedback from the team meeting
- Samuel: add different kinds of robot picture
- Jerry: switch to a better picture for last year’s team picture
- Abhishek: add one slide on the different components on the robot
- Austin: switch to a better robot picture
- RCCG Church Demo event preparation
- Jerry: assign the pack list to the cars based on availability; follow up with the activity leads to update the preparation document; make sure you call out the activity lead names so they know they have something to do
- Activity leads: double check the pack list in Jerry’s preparation doc for the even and put high level planning of the activity in the event preparation document (for example, are you running the activity as is or modified version, put your detailed activity preparation google doc link there for a quick reference)
- Austin: prepare the button mapping and configuration spec of 12810 robot for laminating.
- Anthony/Ray: bring EV3 robots during next team meeting to test out in the maze at my home
- Youth Robotics Fair preparation
- Actions needed for the preparation
- Everyone:
- add to your preparation doc on how many tables/chairs that you need for the activity (in the material table)
- Evan/Abhishek: FTC Robot scrimmage and driving experience — final actions after reviewing
- split the information into our own explanation (technical points, including the content copied from Boys and girls preparation doc) and the reference points that volunteers need;
- preparing the scoring form for the volunteers
- Abhishek/Amanda: Myoelectric Prosthetic Arm Experience — final actions after reviewing
- make sure the arm is working with the Arduino board from Brandon’s Dad;
- add in setup steps for completeness.
- Finalize the technical points, I will make two laminated sheets by 4/29 demo event, one for muscle diagram, one for technical points with code on the back (this will help explaining)
- Justin/Austin: Robo Sumo wrestling
- Joint discussions on the update based on information from the other two events
- Austin/Justin: Line follower contest
- Joint discussions on the update based on information from the other two events
- Samuel/Anthony: Roomba virtual challenge
- Add in visual aids for technical points explanation (flowchart, python sample code etc)
- complete the setup of Python and virtual Roomba on laptop
- Jerry/Max: 3D design Challenge
- 4/28 meeting: setup on Max’s laptop; get Max familiar with the entire activity flow
- Brandon/Ray: ipad RVW programming challenge
- no further actions and Ready for Coach review and approve
- Melody: Rubber Band Race Car
- no further actions and Ready for Coach review and approve
- Derek: Spartan robot
- Add in visual aids IR sensor range explanation
- Max/Anthony: EV3 maze
- Max to merge old and new preparation content into one document follow this year’s template
- Anthony to improve the tilt app for controlling the EV3 robot so we can test it out at RCCG church demo
- Audrey: Machine learning with IBM Watson Assistant and Scratch (MakeMeHappy)
- complete the machine learning activity following the worksheet that I sent in email (make me happy) so we can start design our activity next meeting
- Everyone:
- Actions needed for the preparation
Technical
- Everyone: log your entries to the April engineering notebook; continue for this week, you will log anything your learnt and resolved in PTC while working on your chassis model and a picture of the latest chassis model in the engineering notebook, Due midnight Friday night
8565 Pre-season Team Meeting #4 – 04/21/2018