Skip to content
Technicbots FTC Team #8565

Technicbots FTC Team #8565

FTC Team #8565

Menu

  • Home
  • Our Team
  • Team History
  • Outreach
  • Open Source Software
  • Team USA
    • Team USA 2022
    • Team USA 2021
  • Contact Us

Author: Jerry Chen

Technicbots Meeting #13 – 12/3/16

Italics means action items not done last week. Strike through means items that will not be checked this week, but will be checked in the future. Take team member attendance in the team attendance tracker sheet in blog (Jerry) Check

Jerry Chen December 3, 2016July 16, 2019 2016-2017 No Comments Read more

11/26/16 Software

Today we wrote the test ops for the robot and tested the new SDK. There are 2 test programs: Motor Test – Tests Driving/Turning methods used in autonomous and servos. Phase 1: Tests methods for LinearOpMode encoderGyroDrive forwards and backwards

Jerry Chen November 25, 2016July 16, 2019 Uncategorized No Comments Read more

11/26/16 Hardware

The cap ball mechanism will go through more changes, as the new version is performing only on the same level as the first version and is outside 18 inches. The channel that holds both arms for the mechanism is on

Jerry Chen November 25, 2016July 16, 2019 Uncategorized No Comments Read more

11/26/16 CAD

Jerry Chen November 25, 2016July 16, 2019 Uncategorized No Comments Read more

Technicbots Meeting #12 – 11/26/16

Italics means action items not done last week. Strike through means items that will not be checked this week, but will be checked in the future. Take team member attendance in the team attendance tracker sheet in blog (Justin) Check

Jerry Chen November 25, 2016July 16, 2019 2016-2017 No Comments Read more

11/19/16 Hardware

Throughout the week, the robot’s electronics were repositioned to clean up space so that we would know approximately how much space was available for a sweeper and shooter. From the first scrimmage, the cap ball mechanism had several main problems:

Jerry Chen November 19, 2016July 16, 2019 Uncategorized No Comments Read more

11/19/16 Software

11/21 Debugging Session: We quickly fixed both sides of the autonomous and changed the navigation to the first beacon a bit. This is the new navigation diagram. We drive to the first beacon using encoder+gyro and use the light sensor

Jerry Chen November 19, 2016July 16, 2019 Uncategorized No Comments Read more

11/19/16 CAD

This is our new system envelope with the cap ball and the harvester and shooter.   The yellow is the autonomous beacon mechanism, the red is the teleop beacon mechanism, the light blue is the cap ball mechanism, the pink

Jerry Chen November 19, 2016July 16, 2019 Uncategorized No Comments Read more

Technicbots Meeting #11 – 11/19/16

Italics means action items not done last week. Strike through means items that will not be checked this week, but will be checked in the future. Take team member attendance in the team attendance tracker sheet in blog (Jerry) Check

Jerry Chen November 19, 2016July 16, 2019 2016-2017 No Comments Read more

11/12/16 CAD

This is our updated system envelope for the cap ball robot.   Pink is the chassis, blue is the cap ball mechanism, yellow is the autonomous mechanism, and red is the teleop mechanism.     New Robot Chasis  

Jerry Chen November 12, 2016July 16, 2019 Uncategorized No Comments Read more
  • « Previous
  • Next »

Team Login
Twitter
YouTube

Email: technicbots.team@gmail.com

Copyright © 2025 Technicbots FTC Team #8565. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.