Skip to content
Technicbots FTC Team #8565

Technicbots FTC Team #8565

FTC Team #8565

Menu

  • Home
  • Our Team
  • Team History
  • Outreach
  • Open Source Software
  • Team USA
    • Team USA 2022
    • Team USA 2021
  • Contact Us

Uncategorized

1/21/17 Hardware

A new shooter is in progress will be made to prevent it from breaking down again. The shooter will also be further to the right to hopefully fit 3 balls at the top. The front guider wheels are being moved

Jerry Chen January 21, 2017July 16, 2019 Uncategorized No Comments Read more

1/21/17 CAD

Simulating the robot on the field There are no posts on any of the forum pages about simulating robots on a field The only possible solution is drawing a line on the field, and have the robot move along the

Jerry Chen January 21, 2017July 16, 2019 Uncategorized No Comments Read more

Technicbots Meeting #19 – 1/21/16

Italics means action items not done last week. Strike through means items that will not be checked this week, but will be checked in the future. Take team member attendance in the team attendance tracker sheet in blog (Jerry) Check

Jerry Chen January 21, 2017July 16, 2019 2016-2017, Uncategorized No Comments Read more

1/7/17 Hardware

The wooden plates used to press the beacons were replaced with a thinner aluminum plate since the wooden plate was too thick. The team numbers were added to the bacm and the front of the robot.

Jerry Chen January 6, 2017July 16, 2019 Uncategorized No Comments Read more

1/7/17 Software

No major software changes this week, since we (somehow) finished 100% of the code early. However, we updated the control award application with suggestions from the team, and we practiced our presentation of the autonomous during the judging session. We

Jerry Chen January 6, 2017July 16, 2019 Uncategorized No Comments Read more

1/7/17 CAD

Major additions to the CAD robot – Fully constrained and modeled shooting mechanism Still not simulated Fully constrained and simulated Linear slide, Harvester Also got animation with cap ball lift. https://www.youtube.com/watch?v=gbB783QgQLw&feature=youtu.be

Jerry Chen January 6, 2017July 16, 2019 Uncategorized No Comments Read more

Technicbots Meeting #18 – 1/7/16

Italics means action items not done last week. Strike through means items that will not be checked this week, but will be checked in the future. Take team member attendance in the team attendance tracker sheet in blog (Jerry) Check

Jerry Chen January 6, 2017July 16, 2019 2016-2017, Uncategorized No Comments Read more

1/2/17 Software

Jerry Chen January 2, 2017July 16, 2019 Uncategorized No Comments Read more

1/2/17 Hardware

The servo controller was moved so it wouldn’t block the linear lift from going up.

Jerry Chen January 2, 2017July 16, 2019 Uncategorized No Comments Read more

1/2/17 CAD

Jerry Chen January 2, 2017July 16, 2019 Uncategorized No Comments Read more
  • « Previous
  • Next »

Team Login
Twitter
YouTube

Email: technicbots.team@gmail.com

Copyright © 2025 Technicbots FTC Team #8565. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.